Saturday, August 7, 2010

Undressing tops, of the piles



After the piles are set to solid ground to provide for a good foundation, the excess length of free column is removed in the most noisy way.
This lorry brought the petrol powered driller to remove the cement on the iron rods. Pile caps will be built around these iron rods.
The noise literally shook the ground with the noise level probably equivalent to a small earth quake. The amazing thing is the worker was not even wearing any protective gears. Really man of steel!

No comments:

Post a Comment